NOTE
If there is damage (for example, if the package is soaked or deformed, or the seals or pressure-sensitive
adhesive tapes are not intact), submit the
Cargo Problem Feedback Form
.
Step 2
Cut open the pressure-sensitive adhesive tape on the package, and open the box.
Be careful with the box cutter to avoid personal injury or equipment damage.
Step 3
Check the contents against
to ensure that nothing is missing. Check that they are
free from oxidation, corrosion, or damage.
Table 4-2
Shipped items
No.
Description
1
Documentation bag that contains a warranty card, and a Quick Start Guide
2
Guide rails
3
Rack server
----End
4.3 Installing Optional Parts
Before installing and configuring the server, you need to install all optional parts required, for
example, extra drives, and PCIe cards. For details, see
4.4 Installing the Server on Guide Rails
4.4.1 Installing with L-Shaped Guide Rails
L-shaped guide rails are designed for Huawei cabinets.
The TaiShan 2280 V2 servers are stackable when L-shaped guide rails are used.
Step 1
Install the floating nuts.
1.
Determine the installation positions according to the cabinet device installation plan.
NOTE
Floating nuts are used to tighten screws.
The spacing boundary is used as the reference for calculating device installation space. See
TaiShan 2280 V2 Server
User Guide
4 Setup
Issue 01 (2019-07-01)
Copyright © Huawei Technologies Co., Ltd.
56