Step 11
Install the chassis cover. For details, see
3.7 Installing the Chassis Cover
Step 12
Install the server. For details, see
4.4 Installing the Server on Guide Rails
.
Step 13
Connect the power cables. For details, see
3.5 Connecting Cables to a PSU
.
Step 14
Power on the server. For details, see
----End
3.12 Removing a Riser Card Tray
Step 1
Wear an ESD wrist strap. For details, see
12 Preventing Electrostatic Discharge
.
Step 2
Power off the server. For details, see
Step 3
Remove the power cables. For details, see
3.4 Removing Cables from a PSU
.
Step 4
Remove the server. For details, see
3.3 Removing the Server and Guide Rails
.
Step 5
Remove the chassis cover. For details, see
3.6-Removing the Chassis Cover
.
Step 6
For riser module 1 or 2, remove the screw that secures the riser card tray and lift the tray. See
Figure 3-17
Removing the riser card tray of riser module 1
TaiShan 2280 V2 Server
User Guide
3 Basic Operations
Issue 01 (2019-07-01)
Copyright © Huawei Technologies Co., Ltd.
44