SUN2000-(3.8KTL-11.4KTL)-USL0
User Manual
7 Operations on the Local FusionHome App
Issue 01 (2018-05-21)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
88
Figure 7-25
Energy control
7.4.3.4.1 Grid-tied Point Control
Procedure
Step 1
On the
Operation console
screen, choose
Device maint
>
Energy control
>
Grid-tied point
control
and perform the required operation.
Figure 7-26
Grid-tied point control
Table 7-4
Description of control mode parameters
Parameter
Description
Value Range
Control mode
If this parameter is set to
Default
, the SUN2000
output power is not limited.
The SUN2000 can export its
rated power to the power
grid.
If this parameter is set to
Grid connection with zero
power
and the SUN2000 is
connected to a power meter,
the output power of the
SUN2000 is supplied only
to the local load, but not the
power grid.
If this parameter is set to
Power-limited Grid
Default
Grid connection with
zero power
Power-limited Grid
Connection