SUN2000-(3.8KTL-11.4KTL)-USL0
User Manual
4 System Installation
Issue 01 (2018-05-21)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
28
Procedure
Step 1
Determine the positions for drilling holes using the marking-off template. Level the positions
of mounting holes using a level, and mark the positions with a marker.
Figure 4-9
Determining hole positions
(1) Bottom alignment line for the mounting bracket (top)
Step 2
Drill holes using a hammer drill.
You are advised to apply anti-rust paint on to the hole positions for protection.