SUN2000-(3.8KTL-11.4KTL)-USL0
User Manual
8 System Maintenance
Issue 01 (2018-05-21)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
141
Figure 8-11
Placing the new power compartment
Step 10
After cables are routed, install the upper mounting kit of the new power compartment onto the
mounting bracket. Reinstall the four M6 screws to secure the power and maintenance
compartments.
Figure 8-12
Securing the power and maintenance compartments
Step 11
Reinstall the ground, fuse, AC and DC cables in sequence.
Step 12
Reinstall the USB cable (optional, only for the 4G model), or reinstall the WLAN cable
(optional, only for the WLAN model).
Step 13
Reinstall the 10-pin signal terminal and 2-pin enable terminal.
Step 14
Reinstall the maintenance compartment cover.