6.417.999.120
Issued 06/2005
6.6
VK 5012
Inspection and maintenance work
Before the baling press is set to operation again, the axial piston pump must be
bleeded.
- For that unscrew the hydraulic hose from the leakage oil port (L) and top up the
pump housing with hydraulic fluid.
- Reinstall the hydraulic hose
- Turn on the main switch
- Advance and retract the press ram several times in manual operation
- With the press ram in the front limit position check the oil level in the sight glass on
the hydraulic fluid tank and top it up if necessary
L
Содержание VK 5012
Страница 16: ...6 417 999 120 Issued 06 2005 General information VK 5012 2 4 ...
Страница 17: ...6 417 999 120 Issued 06 2005 VK 5012 Technical data 3 1 3 Technical data 3 1 Dimensions ...
Страница 24: ...6 417 999 120 Issued 06 2005 Technical data VK 5012 3 8 ...
Страница 28: ...6 417 999 120 Installation VK 5012 Issued 06 2005 4 4 ...
Страница 64: ...6 417 999 120 Installation VK 5012 Issued 06 2005 5 36 ...
Страница 92: ...Spare parts and accessories VK 5012 6 417 999 120 Issued 06 2005 7 2 ...
Страница 94: ......
Страница 95: ......
Страница 96: ......