Powering up the server
To power up the server, press the Power On/Standby button.
Power down the server
Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT:
When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server , use one of the following methods:
• Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby
mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby
mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If
an application stops responding, you can use this method to force a shutdown.
• Use a virtual power button selection through iLO .
This method initiates a controlled remote shutdown of applications and the OS before the server enters
standby mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is
amber.
Extend the server from the rack
WARNING:
To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately stabilized
before extending a component from the rack.
Procedure
.
.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server .
4.
Loosen the screws from the latch ears and release the latches on each side of the server .
5.
Extend the server from the rack.
30
Powering up the server
Содержание ProLiant ML350
Страница 12: ...12 Customer self repair...
Страница 13: ...Customer self repair 13...
Страница 14: ...14 Customer self repair...
Страница 15: ...Customer self repair 15...
Страница 25: ...Illustrated parts catalog 25...
Страница 64: ...SFF configuration Two SAS Expanders 64 Removal and replacement procedures...
Страница 91: ...Rack orientation 24 LFF drives Tower orientation Component identification 91...
Страница 93: ...Rack orientation One SAS expander configuration with LFF drives Tower orientation Component identification 93...
Страница 94: ...Rack orientation Two SAS expanders configuration with SFF drives Tower orientation 94 Component identification...
Страница 106: ...Storage controller installed in slot 6 to 9 106 Cabling...
Страница 114: ...LFF configuration SAS Expander cabling One SAS Expander LFF configuration 114 SAS Expander cabling...
Страница 115: ...SFF configuration Two SAS Expanders Cabling 115...