CAUTION:
To avoid damaging the connectors, always install the air baffle into the server before installing the
riser cages.
19.
Install a primary PCIe riser cage with a 4-port NVMe riser card installed (
on page 38).
20.
Install the butterfly PCIe riser cage (
Installing a butterfly PCIe riser cage
on page 80).
21.
Install the access panel (
on page 37).
22.
Install the server into the rack (
Installing the server into the rack
23.
Connect each power cord to the server.
24.
Connect each power cord to the power source.
Installing a butterfly PCIe riser cage
CAUTION:
To prevent damage to the server or expansion boards, power down the server and remove all AC power
cords before removing or installing the PCI riser cage.
Prerequisites
Before installing this option, be sure that you have the following:
• The components included with the hardware option kit
• A T-10 Torx screwdriver might be needed to unlock the access panel.
Procedure
1.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack (
Extending the server from the rack
• Remove the server from the rack (
Removing the server from the rack
4.
on page 36).
80
Installing a butterfly PCIe riser cage
Содержание ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module 12 Front panel LEDs and buttons...
Страница 76: ...2 Prepare the drive 3 Install the drive 4 Observe the LED status of the drive 76 Installing hardware options...
Страница 129: ...Front panel USB port cabling Power switch module Systems Insight Display module cabling Front panel USB port cabling 129...