3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
• Extend the server from the rack (
Extending the server from the rack
• Remove the server from the rack (
Removing the server from the rack
5.
on page 36).
CAUTION:
Do not operate the server for long periods with the access panel open or removed. Operating the
server in this manner results in improper airflow and improper cooling that can lead to thermal
damage.
6.
Remove the primary PCIe riser cage (
7.
If installed, remove the butterfly riser cage (
on page 39).
8.
Remove the air baffle (
on page 40).
9.
If installed, remove the processor mezzanine tray (
Removing the processor mezzanine tray
on page
45).
10.
Install the processor heatsink assembly:
a.
Locate the Pin 1 indicator on the processor carrier and the socket.
b.
Align the processor heatsink assembly with the heatsink alignment pins and gently lower it down until
it sits evenly on the socket.
The heatsink alignment pins are keyed. The processor heatsink assembly will only install one way.
Your heatsink may look different than the one shown.
100
Installing hardware options
Содержание ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module 12 Front panel LEDs and buttons...
Страница 76: ...2 Prepare the drive 3 Install the drive 4 Observe the LED status of the drive 76 Installing hardware options...
Страница 129: ...Front panel USB port cabling Power switch module Systems Insight Display module cabling Front panel USB port cabling 129...