![HPE ProLiant DL580 Gen10 Скачать руководство пользователя страница 78](http://html1.mh-extra.com/html/hpe/proliant-dl580-gen10/proliant-dl580-gen10_user-manual_2175822078.webp)
Installing a 4-port NVMe mezzanine card
Prerequisites
Before installing this option, be sure that you have the following:
• The components included with the hardware option kit
• A T-10 Torx screwdriver might be needed to unlock the access panel.
• A primary riser PCIe riser cage with a 4-port NVMe riser card installed.
Procedure
1.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack (
Extending the server from the rack
• Remove the server from the rack (
Removing the server from the rack
4.
on page 36).
CAUTION:
Do not operate the server for long periods with the access panel open or removed. Operating the
server in this manner results in improper airflow and improper cooling that can lead to thermal
damage.
5.
Remove the primary PCIe riser cage (
NOTE:
If you are not installing a new primary PCIe riser cage that has a 4-port NVMe riser card installed, be
sure to remove the riser card from the existing primary PCIe riser cage, and replace it with a 4-port
NVMe riser card.
6.
If installed, remove the butterfly riser cage (
on page 39).
7.
Remove the air baffle (
on page 40).
8.
If installed, remove the processor mezzanine tray (
Removing the processor mezzanine tray
on page
45).
9.
on page 42).
10.
Remove the fan cage holders (
on page 44).
11.
Install the bracket.
78
Installing a 4-port NVMe mezzanine card
Содержание ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module 12 Front panel LEDs and buttons...
Страница 76: ...2 Prepare the drive 3 Install the drive 4 Observe the LED status of the drive 76 Installing hardware options...
Страница 129: ...Front panel USB port cabling Power switch module Systems Insight Display module cabling Front panel USB port cabling 129...