![HPE ProLiant DL580 Gen10 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/hpe/proliant-dl580-gen10/proliant-dl580-gen10_user-manual_2175822041.webp)
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack (
Extending the server from the rack
on page 32).
• Remove the server from the rack (
Removing the server from the rack
on page 33).
4.
Remove the access panel (
on page 36).
CAUTION:
Do not operate the server for long periods with the access panel open or removed. Operating the
server in this manner results in improper airflow and improper cooling that can lead to thermal
damage.
5.
Remove the primary PCIe riser cage (
on page 39).
6.
If installed, remove the butterfly riser cage (
on page 39).
7.
Remove the air baffle.
Installing the air baffle
CAUTION:
For proper cooling do not operate the server without the access panel, baffles, expansion slot covers, or
blanks installed. If the server supports hot-plug components, minimize the amount of time the access
panel is open.
CAUTION:
To avoid damaging the connectors, always install the air baffle into the server before installing the riser
cages.
Installing the air baffle
41
Содержание ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module 12 Front panel LEDs and buttons...
Страница 76: ...2 Prepare the drive 3 Install the drive 4 Observe the LED status of the drive 76 Installing hardware options...
Страница 129: ...Front panel USB port cabling Power switch module Systems Insight Display module cabling Front panel USB port cabling 129...