4.
If the locking latch is locked, use a T-15 Torx screwdriver to unlock the latch.
5.
Open the locking latch.
The access panel slides back, releasing it from the chassis.
6.
Lift and remove the access panel.
Turn the access panel over to locate the server label. This label provides convenient access to component
identification and LED status indicators.
Installing the access panel
Procedure
1.
Place the access panel on top of the server with the latch open.
Allow the panel to extend past the rear of the server approximately 1.25 cm (0.5 in).
2.
Push down on the latch.
The access panel slides to a closed position.
3.
Tighten the security screw on the latch.
Installing the access panel
37
Содержание ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module 12 Front panel LEDs and buttons...
Страница 76: ...2 Prepare the drive 3 Install the drive 4 Observe the LED status of the drive 76 Installing hardware options...
Страница 129: ...Front panel USB port cabling Power switch module Systems Insight Display module cabling Front panel USB port cabling 129...