Powering down the server.......................................................................................................... 43
Extending the server from the rack............................................................................................. 43
Removing the server from the rack.............................................................................................44
Releasing the cable management arm....................................................................................... 45
Removing the bezel.................................................................................................................... 45
Removing the access panel........................................................................................................46
Installing the access panel..........................................................................................................47
Removing a riser cage................................................................................................................ 48
Removing an expansion slot blank............................................................................................. 49
Removing a riser board...............................................................................................................51
Removing the air baffle............................................................................................................... 52
Installing the air baffle................................................................................................................. 53
Hardware options installation..............................................................55
Introduction................................................................................................................................. 55
Installing the bezel and the bezel lock........................................................................................ 55
Drive options............................................................................................................................... 56
Drive guidelines................................................................................................................56
Drive support information................................................................................................. 56
Installing a hot-plug SAS or SATA drive........................................................................... 57
Installing an NVMe drive.................................................................................................. 59
Installing the 8-bay SFF drive cage..................................................................................60
Installing the rear 2-bay SFF drive cage.......................................................................... 62
Installing the NVMe drive cage in the LFF chassis.......................................................... 65
Installing the 8 to 12 upgrade option in the LFF chassis..................................................67
Installing the optical drive in the LFF chassis...................................................................71
Installing the optical drive or NVMe drives in the SFF chassis ....................................... 74
Storage controller installation guidelines..........................................................................77
Installing an HPE Smart Array controller..........................................................................77
Configuring an HPE Smart Array Gen10 controller..........................................................79
Processor cautions...........................................................................................................83
Installing the processor heatsink assembly......................................................................84
Fan population guidelines................................................................................................ 86
Fan mode behavior.......................................................................................................... 86
Installing a fan.................................................................................................................. 87
DIMM label identification.................................................................................................. 88
Installing a DIMM..............................................................................................................90
Installing a riser board......................................................................................................91
Installing a PCIe riser cage.............................................................................................. 92
PCIe slot guidelines for network cards and PCIe workload accelerator options ............. 95
Installing an expansion board.......................................................................................... 96
Installing the HPE 12G SAS Expander Card option.........................................................98
Installing a GPU card..................................................................................................... 100
4
Содержание ProLiant DL180
Страница 30: ...24 bay SFF hot plug drive model Fan bay numbering 30 Component identification...
Страница 58: ...SFF 4 Install the drive LFF SFF 58 Hardware options installation...
Страница 97: ...Secondary riser cage Slot 4 Slot 5 or 6 Hardware options installation 97...
Страница 112: ...Secondary riser cage Rear 2 bay SFF drive cage 10 Remove the nonredundant power supply 112 Hardware options installation...
Страница 127: ...Cable routing SFF drive model Box 1 to type a controller Box 1 to type p controller Cabling 127...
Страница 128: ...Box 2 to type a controller Box 2 to type p controller 128 Cabling...
Страница 129: ...Box 3 to system board Box 3 to type a controller Cabling 129...
Страница 130: ...Box 3 to type p controller 8 bay SFF power cable default 130 Cabling...
Страница 135: ...Mini SAS cable to SAS expander Cabling 135...
Страница 137: ...M 2 SSD enablement board installed in secondary riser Cabling 137...
Страница 141: ...Cable routing USB 3 0 Cable routing Power supply HPE 500W power supply cabling non hot plug Cabling 141...
Страница 142: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 142 Cabling...
Страница 144: ...Secondary riser cage Slot 4 Slot 5 or 6 144 Cabling...
Страница 145: ...Cable routing GPU Color Description Orange GPU power cable Blue Rear 2 bay SFF power cable Cabling 145...