b.
Disconnect all peripheral cables from the server.
c.
Disconnect each power cord from the server.
2.
Disengage the server from the rack:
a.
Pull down the quick release levers on each side of the server.
b.
If necessary, use a T-25 Torx screwdriver to loosen the shipping screws.
c.
Slide the server out of the rack.
Removing the server from the rack
WARNING:
This server is heavy. To reduce the risk of personal injury or damage to the equipment:
• Observe local occupational health and safety requirements and guidelines for manual material
handling.
• Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. Hewlett Packard Enterprise recommends that a minimum of
two people are required for all rack server installations. A third person may be required to help
align the server when the server is installed higher than chest level.
• Use caution when installing the server in or removing the server from the rack; it is unstable
when not fastened to the rails.
To remove the server from a Hewlett Packard Enterprise, Compaq-branded, Telco, or a third-party rack:
Procedure
.
2.
Remove all power.
44
Operations
Содержание ProLiant DL180
Страница 30: ...24 bay SFF hot plug drive model Fan bay numbering 30 Component identification...
Страница 58: ...SFF 4 Install the drive LFF SFF 58 Hardware options installation...
Страница 97: ...Secondary riser cage Slot 4 Slot 5 or 6 Hardware options installation 97...
Страница 112: ...Secondary riser cage Rear 2 bay SFF drive cage 10 Remove the nonredundant power supply 112 Hardware options installation...
Страница 127: ...Cable routing SFF drive model Box 1 to type a controller Box 1 to type p controller Cabling 127...
Страница 128: ...Box 2 to type a controller Box 2 to type p controller 128 Cabling...
Страница 129: ...Box 3 to system board Box 3 to type a controller Cabling 129...
Страница 130: ...Box 3 to type p controller 8 bay SFF power cable default 130 Cabling...
Страница 135: ...Mini SAS cable to SAS expander Cabling 135...
Страница 137: ...M 2 SSD enablement board installed in secondary riser Cabling 137...
Страница 141: ...Cable routing USB 3 0 Cable routing Power supply HPE 500W power supply cabling non hot plug Cabling 141...
Страница 142: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 142 Cabling...
Страница 144: ...Secondary riser cage Slot 4 Slot 5 or 6 144 Cabling...
Страница 145: ...Cable routing GPU Color Description Orange GPU power cable Blue Rear 2 bay SFF power cable Cabling 145...