15.
Ensure that the GPU bracket is secured with the latch on the air baffle.
16. Connect the power cable to GPU installed in secondary riser cage
.
18. Install the server into the rack
.
19.
Connect all peripheral cables to the server.
20.
Connect each power cord to the server.
21.
Connect each power cord to the power source.
The installation is complete.
Installing the FlexibleLOM adapter
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• T-15 Torx screwdriver
• T-10 Torx screwdriver
• FlexibleLOM riser cage
Procedure
1.
.
2.
3.
Remove all power:
Hardware options installation
103
Содержание ProLiant DL180
Страница 30: ...24 bay SFF hot plug drive model Fan bay numbering 30 Component identification...
Страница 58: ...SFF 4 Install the drive LFF SFF 58 Hardware options installation...
Страница 97: ...Secondary riser cage Slot 4 Slot 5 or 6 Hardware options installation 97...
Страница 112: ...Secondary riser cage Rear 2 bay SFF drive cage 10 Remove the nonredundant power supply 112 Hardware options installation...
Страница 127: ...Cable routing SFF drive model Box 1 to type a controller Box 1 to type p controller Cabling 127...
Страница 128: ...Box 2 to type a controller Box 2 to type p controller 128 Cabling...
Страница 129: ...Box 3 to system board Box 3 to type a controller Cabling 129...
Страница 130: ...Box 3 to type p controller 8 bay SFF power cable default 130 Cabling...
Страница 135: ...Mini SAS cable to SAS expander Cabling 135...
Страница 137: ...M 2 SSD enablement board installed in secondary riser Cabling 137...
Страница 141: ...Cable routing USB 3 0 Cable routing Power supply HPE 500W power supply cabling non hot plug Cabling 141...
Страница 142: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 142 Cabling...
Страница 144: ...Secondary riser cage Slot 4 Slot 5 or 6 144 Cabling...
Страница 145: ...Cable routing GPU Color Description Orange GPU power cable Blue Rear 2 bay SFF power cable Cabling 145...