3.
Launch the Windows Installer and follow the instructions to complete the upgrade.
4.
Register the Windows X9000 client again with the cluster and check the option to
Start Service
after Registration
.
5.
Check
Administrative Tools
|
Services
to verify that the X9000 Client service is started.
6.
Launch the Windows X9000 client. On the Active Directory Settings tab, click
Update
to
retrieve the current Active Directory settings.
7.
Mount file systems using the X9000 Windows client GUI.
NOTE:
If you are using Remote Desktop to perform an upgrade, you must log out and log back
in to see the drive mounted.
Troubleshooting upgrade issues
If the upgrade does not complete successfully, check the following items. For additional assistance,
contact HP Support.
Automatic upgrade
Check the following:
•
If the initial execution of
/usr/local/ibrix/setup/upgrade
fails, check
/usr/local/ibrix/setup/upgrade.log
for errors. It is imperative that all servers are
up and running the X9000 Software before you execute the upgrade script.
•
If the install of the new OS fails, power cycle the node. Try rebooting. If the install does not
begin after the reboot, power cycle the machine and select the
upgrade
line from the
grub
boot menu.
•
After the upgrade, check
/usr/local/ibrix/setup/logs/postupgrade.log
for errors
or warnings.
•
If configuration restore fails on any node, look at
/usr/local/ibrix/autocfg/logs/appliance.log
on that node to determine which
feature restore failed. Look at the specific feature log file under
/usr/local/ibrix/setup/
logs/
for more detailed information.
To retry the copy of configuration, use the command appropriate for your server:
◦
A dedicated management console:
/usr/local/ibrix/autocfg/bin/ibrixapp upgrade -f
◦
A file serving node:
/usr/local/ibrix/autocfg/bin/ibrixapp upgrade –s
◦
An agile node (a file serving node hosting the agile management console):
/usr/local/ibrix/autocfg/bin/ibrixapp upgrade –f –s
•
If the install of the new image succeeds, but the configuration restore fails and you need to
revert the server to the previous install, execute
boot_info –r
and then reboot the machine.
This step causes the server to boot from the old version (the alternate partition).
•
If the public network interface is down and inaccessible for any node, power cycle that node.
74
Upgrading the X9000 Software
Содержание StorageWorks X9320
Страница 97: ...13 When the Configure Network dialog box reappears select bond0 Configuring a file serving node manually 97 ...
Страница 108: ...Cabling diagrams Cluster network cabling diagram 108 System component and cabling diagrams ...
Страница 109: ...SATA option cabling Description Line SAS I O pathController A SAS I O pathController B Cabling diagrams 109 ...
Страница 144: ...English notice Estonian notice Finnish notice French notice 144 Regulatory compliance and safety ...
Страница 145: ...German notice Greek notice Hungarian notice Italian notice Waste Electrical and Electronic Equipment directive 145 ...
Страница 146: ...Latvian notice Lithuanian notice Polish notice Portuguese notice 146 Regulatory compliance and safety ...
Страница 147: ...Slovakian notice Slovenian notice Spanish notice Swedish notice Waste Electrical and Electronic Equipment directive 147 ...