
Hardware options installation 72
3.
Insert the power supply into the power supply bay until it clicks into place.
4.
Connect the power cord to the power supply.
5.
For rack servers, use the strain relief clip from the server hardware kit to secure the power cord.
6.
Connect the power cord to the power source.
7.
Be sure that the power supply LED is green.
Hot-plug SAS drive options
When adding drives to the server, observe the following general guidelines:
•
The system automatically sets all device numbers.
•
If only one drive is used, install it in the bay with the lowest device number ("
SAS and SATA device
numbers
" on page
15
).
•
Drives should be the same capacity to provide the greatest storage space efficiency when drives are
grouped together into the same drive array.
Removing the drive blank
1.
Do one of the following:
Содержание ProLiant ML350p Gen8
Страница 19: ...Component identification 19 Item Connector Description 5 J8 Graphic card power connector ...
Страница 30: ...Operations 30 ...
Страница 39: ...Setup 39 12 Remove the air baffle 13 Remove the fan cage ...
Страница 46: ...Hardware options installation 46 o Cable routing to box 1 o Cable routing to box 2 ...
Страница 67: ...Hardware options installation 67 6 Remove the blank from box 3 7 Install the optical drive cage ...
Страница 99: ...Hardware options installation 99 i Connect the short mini SAS cables ii Connect the long mini SAS cables ...
Страница 137: ...Support and other resources 137 ...
Страница 138: ...Support and other resources 138 ...