Hardware options installation 68
8.
Using the T-15 screws, secure the optical drive cage.
9.
The Torx screws required to install optical drives are located on the chassis.
10.
For tower models, do the following:
a.
Install the access panel (on page
24
).
b.
Return the server to an upright position.
11.
For rack models, do the following:
a.
Install the rack bezel (on page
23
).
b.
Install the access panel (on page
24
).
c.
Slide the server back into the rack.
12.
Connect each power cord to the server.
13.
Connect each power cord to the power source.
14.
Press the Power On/Standby button.
Содержание ProLiant ML350p Gen8
Страница 19: ...Component identification 19 Item Connector Description 5 J8 Graphic card power connector ...
Страница 30: ...Operations 30 ...
Страница 39: ...Setup 39 12 Remove the air baffle 13 Remove the fan cage ...
Страница 46: ...Hardware options installation 46 o Cable routing to box 1 o Cable routing to box 2 ...
Страница 67: ...Hardware options installation 67 6 Remove the blank from box 3 7 Install the optical drive cage ...
Страница 99: ...Hardware options installation 99 i Connect the short mini SAS cables ii Connect the long mini SAS cables ...
Страница 137: ...Support and other resources 137 ...
Страница 138: ...Support and other resources 138 ...