Operations 31
5.
Install the PCI riser cage.
6.
Install the access panel (on page
25
).
7.
Install the server into the rack ("
Installing the server into the rack
" on page
38
).
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
10.
Power up the server (on page
23
).
Secure the full-length expansion board retainer
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
23
).
4.
Remove the access panel (on page
24
).
5.
Install a full-length expansion board ("
Installing a full-length expansion board
" on page
74
).
6.
Install the PCI riser cage (on page
30
).
Содержание ProLiant DL380p Gen8
Страница 6: ...Contents 6 Index 131 ...
Страница 47: ...Hardware options installation 47 14 Install the heatsink 15 Remove the two fan blanks ...
Страница 91: ...Cabling 91 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 92: ...Cabling 92 LFF hard drive cabling Optical drive cabling ...
Страница 93: ...Cabling 93 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Страница 98: ...Cabling 98 Connect the cable as indicated ...
Страница 125: ...Support and other resources 125 ...
Страница 126: ...Support and other resources 126 ...