Removal and replacement procedures 27
If the rack environment, cabling configuration, or the server location in the rack creates awkward
conditions, remove the server from the rack.
•
Remove the PCI riser cages (on page
31
).
•
Remove the air baffle (on page
32
).
•
Remove the fan cage (on page
33
).
Remove the security bezel (optional)
To access the front panel components, unlock and then remove the security bezel. The security bezel is only
supported in servers that are using the quick-release latch rack ears.
Power down the server
Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT:
When the server is in standby mode, auxiliary power is still being provided to the
system.
To power down the server, use one of the following methods:
•
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby
mode.
•
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
•
Use a virtual power button selection through iLO 4.
This method initiates a controlled remote shutdown of applications and the OS before the server enters
standby mode.
Содержание ProLiant DL180 Gen9
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 18: ...Illustrated parts catalog 18 ...
Страница 23: ...Illustrated parts catalog 23 ...
Страница 117: ...Cabling 117 Item Description 5 Fan 5 cable GPU power drive cabling FlexibleLOM sideband signal cabling ...
Страница 121: ...Cabling 121 Item Description 3 USB 3 0 connector cable ...