background image

Operation Instruction

Document No. : Silverbell FA Dismantling SOP

Work Station

:

Operation Item

:                                                                            Ver. :  

Date

:

Jig list(Jig specification)

QTY

Jig list(Jig specification)

QTY

Steps

Attention

If abnormal condition happens, please contact foreman or assistant immediately

.

Department

Tabulation

Zhu.Ya

IE

6(1/1)

Dismantle DDR

1.00

Upper card 

slot

Lower card 

slot

GOOD

1. Push the clips on both side 
of DDR socket, and take out 
DDR for recycle
2.Recycle
hook(

6051B1241101))

2019/9/18

Содержание HP 340 G7

Страница 1: ... column as applicable Item Description Notes Quantity of items included in product Printed Circuit Boards PCB or Printed Circuit Assemblies PCA With a surface greater than 10 sq cm 4 Batteries excluding Li Ion batteries All types including standard alkaline coin or button style batteries 0 Li Ion batteries Include all Li Ion batteries if more than one is provided with the product such as a detacha...

Страница 2: ...e used to disassemble the product to a point where components and materials requiring selective treatment can be removed Tool Description Tool Size if applicable Electric screwdriver Cross Cross 1 Screwdriver 2 Screwdriver 3 3 0 Product Disassembly Process 3 1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment including the requi...

Страница 3: ...3 1 00 11 1 00 19 1 00 4 1 00 12 1 00 20 1 00 5 1 00 13 1 00 21 1 00 6 1 00 14 1 00 22 1 00 7 1 00 15 1 00 23 1 00 8 1 00 16 1 00 Station Ver ALL 1 B Version Modify list Date Content Design 2019 9 18 First version SOP for dismantling Yang Mik MODEL Silverbell Zhou Hong Zhu Ya ...

Страница 4: ...ion QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 1 1 1 Dismantle BTCB Rubber 1 00 2019 9 18 1 Take down the rubber 2pcs marked in red frame Electric screw driver 1 Color Rubber front Rubber Rear Pick silver 6054B2050001 6054B2049901 Stone silver 6054B2162201 6054B2162101 ...

Страница 5: ...abulation Zhu Ya IE 2 1 1 Dismantle BTCB Screw 1 00 1 Take down screw M2 5x4 2pcs Pay attention to color of the NB Pick silver Screw P N 6052B0424501 Stone silver Screw P N 6052B0101901 Dismantling Sequence 1 2 2 Take down screw M2 5x6 6052A0029201 4 Screwdriver bits model 1 Torsion 2 0 0 30 Kgf cm Dismantling Sequence 3 4 5 6 Recycle screw separately 1 2 Electric screw driver 1 Color Screw Pick s...

Страница 6: ...arts which is on the upper right of D cover Dismantling method is as shown in the picture 4 Separate D cover from C cover with a gap then put a sucking disc on the lower right of D cover 5 Left hand holds TOP cover and right hand pulls the sucking disc to take down the D cover as shown in the picture 6 At last close the notebook and put it flat disassemble the side parts of D cover from right to l...

Страница 7: ...QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 4 1 1 Disassemble battery 1 00 2 5 4 3 1 1 Take down BATT screw M2x3 5 6052A0051101 4pcs Screwdriver bits model 1 Torsion 1 5 0 30 Kg cm 2 Take down the battery and recycle it Electric screw driver 1 1 Screwdriver bits 1 2019 9 18 ...

Страница 8: ...ig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 5 1 1 Dismantle DDR 1 00 Upper card slot Lower card slot GOOD 1 Push aside the clips on both side of DDR socket and take out DDR for recycle 2 Recycle hook 6051B1241101 2019 9 18 ...

Страница 9: ...Y Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 6 1 1 Dismantle DDR 1 00 Upper card slot Lower card slot GOOD 1 Push the clips on both side of DDR socket and take out DDR for recycle 2 Recycle hook 6051B1241101 2019 9 18 ...

Страница 10: ...m Ver Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 7 1 1 Dismantle HDD 1 00 1 Dismantle the HDD FFC on MB 2 Take HDD out from C cover 2019 9 18 ...

Страница 11: ...D FFC for recycle pic 1 For EMMC pic 2 2 Disassemble screws M2x3 5 6052A0051101 3 and then recycle EMMC B 1310A2760301 Screwdriver bits model 1 Torsion 1 5 0 30 Kg cm Screws can not be loose For SSD pic 3 Disassemble the screws on SSD Card M2x3 5 6052A0051101 1 recycle SSD Card P N 6022B0260501 Disassemble the screws on SSD Board M2x3 5 6052A0051101 2 Recycle SSD Board 1310A2745101 Scresdriver bit...

Страница 12: ...pecification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 9 1 1 Disassemble HDD Protective Jacket cable 1 00 Here printed 14NB 1 Disassemble HDD patch cord 2 Disassemble HDD protective jacket 2019 9 18 ...

Страница 13: ...ion QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 10 1 1 Disassemble SSD BRKT EMMC BRKT 1 00 1 Disassemble SSD BRKT P N 6053B1557703 or EMMC BRKT 6053B1557704 Need distinguish EMMC BRKT from SSD BRKT SDD BRKT has one more BOSS pillar pic 2 For SSD For EMMC 2019 9 18 pic 1 ...

Страница 14: ...ondition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 11 1 1 Disassemble antenna terminal 1 00 1 Disassemble antenna terminal 2 2 Disassemble screws on SSD wlan module M2x3 5 6052A0051101 2 pic 1 2 Screwdriver bit model 1 Torsion 1 5 0 30 Kgf cm Screws cannot be loose or fall down into notebook 2 Recycle SD WLAN card Electric screwdriver 1 2019 9 18 ...

Страница 15: ... specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 12 1 1 Dismantling USB B FFC Antenna 1 00 1 Dismantle USB B FFC and turn orchid out remove the FFC 2 Dismantle Antenna cable 2 1 2019 9 18 ...

Страница 16: ...ig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 14 1 1 Dismantling Edp cable FFC 1 00 圖一 圖二 1 Dismante Edp cable turn orchid out remove the CNTR 2 Dismante TH pad board FFC 2019 9 18 ...

Страница 17: ...ndition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 15 1 1 1 00 2 圖一 3 4 Remove hinge up Screw 1 Get Hinge UP remove fixed hinge ScrewM2 5x6 6052A0029201 4 5 2 Remove fixed Hinge to MBM2X3 5 6052A0051101 Torque 3 0 0 3 Kgf cm The screw must not slip its teeth and into the machine Disassembly sequence 1 2 3 4 5 1 2 5 Electric screwdriver 1 2019 9 18 ...

Страница 18: ...ification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 16 1 1 1 00 Remove Hinge UP 1 Turn the machine table open at a certain angle and close again make Hinge separate from top 2 Remove the TOP 2019 9 18 ...

Страница 19: ...st Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 17 1 1 1 00 Remove KB FPC DC IN Cable 1 Open the lid of the pot take KBFPC with backlight SKU 2 Get DC IN cable to the right and tilt upward don t force straight up and down hook 2019 9 18 ...

Страница 20: ... Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 18 1 1 1 00 Remove DC IN CNTR Fan CNTR 1 Get DC IN CNTR remove DC IN cable 2 Remove Fan CNTR 2019 9 18 ...

Страница 21: ...s please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 19 1 1 1 00 Dismantling FAN Thermal 1 Get Fan screwM2x3 5 6052A0051101 2 remove FAN and recovery 2 Get Thermal screw as below marked M2x3 5 6052A0051101 2 Starter head model 1 Torque value 1 5 0 3Kgf cm The screw must not slip its teeth and into the machine Disassembly sequence 1 2 3 4 1 2 4 3 1 Electric screwdriver ...

Страница 22: ...ion If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 20 1 1 1 00 Dismantling Thermal 1 Get Thermal screw M2x3 5 6052A0051101 4 recovery thermal Starter head model 1 Torque value 1 5 0 3Kgf cm The screw must not slip its teeth and into the machine Disassembly sequence 1 2 3 4 1 4 3 2 Electric screwdriver 1 2019 9 18 ...

Страница 23: ...abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 21 1 1 1 00 Dismantling MB 1 Get MB screw M2x2 6052B0156201 3 序号1 3 2 Get MB screw M2x3 5 6052A0051101 1 Starter head model 1 Torque value 1 5 0 3Kgf cm The screw must not slip its teeth and into the machine Disassembly sequence 1 2 3 4 1 4 3 2 Electric screwdriver 1 2019 9 18 ...

Страница 24: ...ist Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Zhu Ya IE 22 1 1 1 00 Dismantling MB 1 Push up MB pull out MB downward 2 Recycling Card reader FFC 3 Bagging MB for recycling 2019 9 18 ...

Страница 25: ...ation Zhu Ya IE 23 1 1 Dismantling Finger 2 1 For With FP 1 Remove FP BRK screw 6052B0131701 2 remove FP BRK marked as 1 Starter head model 1 Torque value 1 5 0 3Kgf cm The screw must not slip its teeth and into the machine 2 Remove FP from the TOP For Non FP 1 Remove screw 6052B0131701 2 remove dummy FP marked as 3 Starter head model 1 Torque value 1 5 0 3Kgf cm The screw must not slip its teeth ...

Страница 26: ...Station VersionStation VersionStation Version Station Version 1 1 00 9 1 00 2 1 00 10 1 00 3 1 00 11 1 00 4 1 00 12 1 00 5 1 00 13 1 00 6 1 00 14 1 00 7 1 00 8 1 00 Station Ver ALL 1 B Version Modify list Date Content Design 2019 9 18 First SOP for dismantling Yang Mike MODEL Silverbell Zhou Hong Zhu Ya ...

Страница 27: ...tem Ver Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 1 1 1 Disassemble Hinge cover 1 00 2019 9 18 1 Push down to disassemble Hinge cover ...

Страница 28: ...ps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 2 1 1 Disassemble Bezel 1 00 1 Disassemble left Bezel by pulling the bezel towards inner side 2 Disassemble the ambient bezel in sequence by 1 2 3 4 marked in the picture Do dismantling slowly Can use card to separate gum 1 2 3 4 2019 9 18 ...

Страница 29: ...st Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 3 1 1 Disassemble LCD 1 00 1 Use tweezer to take out the head of the easy to pull sticker on both left and right side then pull it down to make it separate from LCD Tweezer 1 2019 9 18 ...

Страница 30: ...Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 4 1 1 Disassemble LCD 1 00 1 Turn the LCD to back side and take down EDP cable CNTR 2 Keep the LCD well and recycle it 2019 9 18 ...

Страница 31: ...ification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 5 1 1 Disassemble Hinge 1 00 1 Take out the screws on both hinges M2 5x2 5 6052A0047401 6 Screwdriver bits model 1 Torsion 2 5 0 3 Kg cm 2 Disassemble the hinges for recycle Electric Screwdriver 1 2019 9 18 ...

Страница 32: ...item Ver Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 6 1 1 Disassemble Hinge 1 00 1 Disassemble left right hinges for recycle 2019 9 18 ...

Страница 33: ...ecification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 7 1 1 Disassemble W Lantenna 1 00 1 Take the antenna out from slot 2 Pull the left antenna towards the direction of the arrowhead 2019 9 18 ...

Страница 34: ...tion QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 8 1 1 Dismantling W L Antenna 1 00 1 Remove the right antenna from the slot 2 Pull the left antenna out in the same direction 3 Remove the fixed foil pull the antenna out follow the path shown by the arrow 2019 9 18 ...

Страница 35: ...em Ver Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 9 1 1 Dismantling W L Antenna 1 00 1 Remove the right antenna from the slot 2019 9 18 ...

Страница 36: ...teps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 10 1 1 Dismantling W L Antenna 1 00 1 Remove the left antenna and lift PCB up with tweezers then slowly unravels the gule 2 Remove the right antenna and lift the PCB board above with tweezers then slowly release the back glue 2019 9 18 ...

Страница 37: ...m Ver Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 11 1 1 Dismantling EDP cable 1 00 1 Remove the EDP cable follow the arrow path 2019 9 18 ...

Страница 38: ... item Ver Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 12 11 Dismantling EDP cable 1 00 1 Remove the EDP cable in the middle 2019 9 18 ...

Страница 39: ...tion QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 13 1 1 Dismantling camera 1 00 1 Unfold the acetic acid mausoleum pull the EDP cable connector from the camera 2 Dismantling camera and recovery 2019 9 18 ...

Страница 40: ...ion item Ver Date Jig list Jig specification QTY Jig list Jig specification QTY Steps Attention If abnormal condition happens please contact foreman or assistant immediately Department Tabulation Huang Ya jun IE 14 1 1 Recovery A cover 1 00 1 Put A cover in bags and recovery 2019 9 18 ...

Отзывы: