Operation Instruction
Document No. : silverbell LCM Dismantling SOP
Work station
:
Operation item
: Ver. :
Date :
Jig list(Jig specification)
QTY
Jig list(Jig specification)
QTY
Steps
:
Attention
︰
If abnormal condition happens, please contact foreman or assistant immediately.
Department
:
Tabulation
:
Huang.Ya-jun
IE
8(1/1)
Dismantling W/L Antenna
1.00
1. Remove the right antenna from the
slot.
2. Pull the left antenna out in the
same direction.
3. Remove the fixed foil
,
pull the
antenna out follow the path shown
by the arrow.
2019/9/18