Operation Instruction
Document No. : silverbell LCM Dismantling SOP
Work station
:
Operation item
: Ver. :
Date :
Jig list(Jig specification)
QTY
Jig list(Jig specification)
QTY
Steps
:
Attention
︰
If abnormal condition happens, please contact foreman or assistant immediately.
Department
:
Tabulation
:
Huang.Ya-jun
IE
14(1/1)
Recovery A cover
1.00
1. Put A cover in bags and recovery.
2019/9/18