Operation Instruction
Document No. : Silverbell FA Dismantling SOP
Work Station
:
Operation Item
: Ver. :
Date
:
Jig list(Jig specification)
QTY
Jig list(Jig specification)
QTY
Steps
:
Attention
︰
If abnormal condition happens, please contact foreman or assistant immediately
.
Department
:
Tabulation
:
Zhu.Ya
IE
4(1/1)
Disassemble battery
1.00
2
5
4
3
1
1. Take down BATT screw
M2x3.5(
6052A0051101
)
)*4pcs
❖
Screwdriver bits model #1
❖
Torsion
:
1.5
±
0.30 Kg/cm
2. Take down the battery, and recycle it.
Electric screw driver
1
#1 Screwdriver bits
1
2019/9/18