Operation Instruction
Document No. : Silverbell FA Dismantling SOP
Work Station
:
Operation Item
: Ver. :
Date
:
Jig list(Jig specification)
QTY
Jig list(Jig specification)
QTY
Steps
:
Attention
︰
If abnormal condition happens, please contact foreman or assistant immediately
.
Department
:
Tabulation
:
Zhu.Ya
IE
20(1/1)
1.00
Dismantling Thermal
1.Get Thermal screw
M2x3.5(
6052A0051101
)*4
,
recovery thermal.
❖
Starter head model: #1
❖
Torque value
:
1.5
±
0.3Kgf
.
cm
❖
The screw must not slip its teeth and into the
machine.
❖
Disassembly sequence
:
1
2
3
4
1
4
3
2
Electric screwdriver
1
2019/9/18