Operation Instruction
Document No. : Silverbell FA Dismantling SOP
Work Station
:
Operation Item
: Ver. :
Date
:
Jig list(Jig specification)
QTY
Jig list(Jig specification)
QTY
Steps
:
Attention
︰
If abnormal condition happens, please contact foreman or assistant immediately
.
Department
:
Tabulation
:
Zhu.Ya
IE
17(1/1)
1.00
Remove KB FPC/DC-IN Cable
1.Open the lid of the pot, take KBFPC with
backlight SKU
2.Get DC-IN cable.to the right and tilt
upward. don’t force straight up and down
.
hook
2019/9/18