118
P
Patch cord,
Pigtail cord,
Pin assignments,
Planning IRF fabric size and the installation site,
Planning IRF topology and connections,
Power,
Power supply LED,
Powering on the switch,
Precautions,
R
Removing a fan tray,
Removing the chassis from the rack,
Removing the console cable,
Removing the grounding cable,
Removing the power cable,
Removing the power cable bracket,
Removing the twisted pair and optical fiber,
Repackaging the card,
Repackaging the plastic panel,
Repackaging the power supply,
Repackaging the switch chassis,
Replacing a switching fabric module,
Replacing an MPU or LPU,
Replacing an SFP+/QSFP+/QSFP+ to SFP+ cable,
Replacing an SFP+/SFP/QSFP+ module,
RJ-45 connector,
S
Setting terminal parameters,
Setting up the configuration environment,
Space,
Subscription service,
Switching fabric module LED,
System power consumption,
T
Temperature,
Troubleshooting the switch during the operation,
V
Verifying the network configuration,
W
Websites,
Weight support,
Содержание FlexFabric 12900 series
Страница 13: ...7 Figure 2 Clearances required for a 12910 AC chassis ...
Страница 108: ...102 Figure 73 Example of a device label ...