113
Figure 83
Repackaging the switch chassis
(1) Wooden pallet base
(2) L-type bracket
(3) Location for the packed plastic panel
3.
Cover the chassis with the packing bag from the top down, and then tape the bag to the plastic
cover of pallet base.
4.
Put the packed plastic panel at the front of the pallet base, as shown in callout 3 of
.
5.
Cover the foam cushion to the chassis top, and make sure the mounting brackets seat into the
internal notches of the foam cushion.
6.
Erect one paper angle bead along each vertical edge of the chassis, and use the carton to cover
the chassis from top down with silkscreen side facing the front panel of the chassis.
7.
Put the box of packed accessories into the notch of the foam cushion that is near to the rear end of
the chassis.
8.
Cover the top cap to the carton.
Содержание FlexFabric 12900 series
Страница 13: ...7 Figure 2 Clearances required for a 12910 AC chassis ...
Страница 108: ...102 Figure 73 Example of a device label ...