Chapter 4
Cabling and Power Up
Voltage Check (Additional Procedure)
46
Voltage Check (Additional Procedure)
The voltage check ensures that all phases (and neutral, for international systems) are connected correctly to
the cabinet and that the AC input voltage is within limits.
This procedure must be performed if the previous voltage check procedure did not yield the expected results
as previously outlined.
NOTE
If a UPS is used, refer to applicable UPS documentation for information to connect the server
and to check the UPS output voltage. UPS User Manual documentation is shipped with the
UPS. Documentation can also be found at http://www.hp.com/racksolutions.
Step 1.
Verify that site power is
OFF
.
Step 2.
Open the site circuit breakers.
Step 3.
Verify that the receptacle ground connector is connected to ground. See Figure 4-4 for connector
details.
Step 4.
Set the site power circuit breaker to
ON
.
Figure 4-4 Wall Receptacle Pinouts
WARNING
There is a risk of shock hazard while testing primary power. Use properly
insulated probes.
Step 5.
Verify that the voltage between receptacle pins X and Y is between 200 and 240 V AC.
Step 6.
Set the site power circuit breaker to
OFF
.
Step 7.
Ensure that power is removed from the server.
Step 8.
Route and connect the server power connector to the site power receptacle.
•
For locking type receptacles, line up the key on the plug with the groove in the receptacle.
•
Push the plug into the receptacle and rotate to lock the connector in place.
Содержание 9000 rp7420
Страница 4: ...Contents iv Index 67 ...
Страница 6: ...Tables vi ...
Страница 8: ...Figures viii ...
Страница 74: ...Chapter 4 Cabling and Power Up Using the Checklist 66 ...
Страница 76: ...Index 68 U unpacking inspecting for damage 12 V verifying system configuration 61 voltage check 46 ...