Chapter 2
Unpacking the Server
Receiving the Server Cabinet
15
Step 6.
Remove the six bolts from the base attaching the rack to the pallet. See Figure 2-3
Figure 2-3 Preparing to Roll Off the Pallet
WARNING
Use caution when rolling the cabinet off the ramp. A single 2-cell server in
the cabinet weighs approximately 220 lb. To avoid a safety hazard, be sure
the leveling feet on the cabinet are raised before you roll the cabinet down
the ramp, and any time you roll the cabinet on the casters. It is strongly
recommended that two people control rolling the cabinet off the pallet.
Step 7.
Attach the ramps to the pallet.
Step 8.
Carefully roll the cabinet down the ramps.
Step 9.
Position cabinet in final location.
Step 10.
Remove pallet, ramps and any other packing material from work area.
Содержание 9000 rp7420
Страница 4: ...Contents iv Index 67 ...
Страница 6: ...Tables vi ...
Страница 8: ...Figures viii ...
Страница 74: ...Chapter 4 Cabling and Power Up Using the Checklist 66 ...
Страница 76: ...Index 68 U unpacking inspecting for damage 12 V verifying system configuration 61 voltage check 46 ...