Chapter 2
Unpacking the Server
Manual Lifting
21
Step 9.
Ensure that the handles are secure by pressing the handles together and moving back and forth.
Figure 2-7 Lift Handles Mounted
Step 10.
Repeat steps 4 through 9 to install handle panel on the opposite side of server.
Step 11.
To lift the server, two individuals may rotate the handles 90 degrees to the horizontal position and
grasp.
NOTE
To ensure proper installation, refer to the
“Installation Guide”
of the HP J1530B
Rack Integration Kit.
Step 12.
After moving the server, remove the lift handle panels from the chassis.
Step 13.
After the server is secured, re-install the previously removed cell boards and bulk power supplies.
Step 14.
Reinstall the side covers and front bezel.
Содержание 9000 rp7420
Страница 4: ...Contents iv Index 67 ...
Страница 6: ...Tables vi ...
Страница 8: ...Figures viii ...
Страница 74: ...Chapter 4 Cabling and Power Up Using the Checklist 66 ...
Страница 76: ...Index 68 U unpacking inspecting for damage 12 V verifying system configuration 61 voltage check 46 ...