Chapter 2
Unpacking the Server
Receiving the Server Cabinet
14
Step 4.
Remove the packing materials.
CAUTION
To reduce any ESD exposure, cut off the plastic wrapping around the cabinet. DO
NOT pull it off the cabinet.
Step 5.
Remove the bolts that hold the ramps to the pallet, and remove the ramps. See Figure 2-2.
NOTE
Figure 2-2 shows one ramp attached to the pallet on either side of the cabinet with
each ramp secured to the pallet using two bolts. There is another configuration
where the the ramps are secured together on one side of the cabinet with one bolt.
Figure 2-2 Removing the Shipping Bolts and Plastic Cover
Plastic wrap
Ramp(s)
Содержание 9000 rp7420
Страница 4: ...Contents iv Index 67 ...
Страница 6: ...Tables vi ...
Страница 8: ...Figures viii ...
Страница 74: ...Chapter 4 Cabling and Power Up Using the Checklist 66 ...
Страница 76: ...Index 68 U unpacking inspecting for damage 12 V verifying system configuration 61 voltage check 46 ...