Air Duct kit 20
c.
Insert two plastic push fasteners into the holes on both sides of the assembly to secure the draw-latch
strap to the upper duct assembly (2).
d.
Repeat steps a through c for the second draw-latch strap.
4.
With the draw-latch straps in the loose position, slide the upper duct down over the lower duct.
5.
Lock the draw-latch straps.
NOTE:
The two 510-mm gaskets sit on the inside edges of the two 520-mm gaskets.