Tie-Down kit 101
3.
Insert and partially tighten four bolts with washers, securing the front tie-down to the front caster plate.
4.
Align the rear tie-down with the holes on the rear caster plate.
5.
Insert the four spring clips, and then partially tighten four bolts with washers, securing the rear tie-down
to the rear caster plate.
6.
Tighten the bolts from step 3.
7.
Tighten the bolts from step 5.
8.
Secure the rack to the floor ("
Securing the rack to the floor
" on page
The installation is complete.
Содержание 669048-009
Страница 39: ...Cable Management Bracket kit 39 Installation is complete ...
Страница 45: ...Cable Management Tray kit 45 4 Route the cables through the cable management tray Ground bonding stud location ...
Страница 60: ...Filler Panel kit 60 ...
Страница 68: ...Hook and Loop Cabling Strap Clip kit 68 ...
Страница 69: ...Hook and Loop Cabling Strap Clip kit 69 Installation is complete ...