27
In the case of star-shaped data bus networks, double
earthing is not permitted. The earthing must be carried
out on one side at the star point.
Earthing for star-shaped data bus
PE
L
H
+
Abschirmung
4-Draht-Bus
PE
Shielding
4-wire bus
PE
•
The outdoor sensor must not be mounted in the vicin-
ity of transmitters and receivers (on garage walls near
receivers for garage door openers, amateur radio an-
tennae, radio alarm installations or in the immediate
vicinity of large transmitters, etc.).
Maximum permitted cable lengths for cables carrying
sensor and low voltage (without PWM):
-
Min. 0.5 mm
2
-
Max. permitted cable length: 50 m
-
Max. PWM cable length according to pump specifi cation
Longer connecting cables should be avoided because of
the danger of radiated interference!
Interbuilding installations
•
Inter-building installations and laying the bus line under-
ground are not permitted
•
Where possible, avoid routing low-voltage and safety
extra-low voltage cables (CAN bus line) in parallel in
adjacent buildings (overbuildings) or through under-
ground car parks. If this cannot be avoided, one or
more of the following options should be selected to im-
prove the decoupling:
-
Increase the spacing distance
-
Route cables in a metal cable tray or metal cable duct
that is enclosed on all sides, and must be well earthed
-
Use high-quality twisted-pair cables
•
Potential diff erences between CAN_H, CAN_L and
ground must be kept low
•
If there are higher potential diff erences, the frequency
of errors will increase until the point when bus traffi c is
completely blocked
To ensure correct electrical installation, unit connec
tion and equipotential bonding (energy supply com
pany and building installation), all applicable laws,
regulations and standards must be complied with;
in particular, the regulations of the responsible ener
gy supply company. Common equipotential bonding
must be carried out in accordance with the regula
tions and standards. The cable shield is not allowed
to be used for equipotential bonding.
The work is only allowed to be carried out by quali
fi ed specialist personnel. It is the responsibility of the
electrician to ensure appropriate EMC installation.
4 213 787 / 01