11
2.4
Assembly of the plinth panelling
Fit the syphon supplied separately (13, Fig. 12).
Fig. 1
Place the condensate box (option) under the boiler
and make the electrical connections. Create connec
-
tion between siphon and condensate box.
13
Fig. 12
4 213 787 / 01
ASSEMBLy
Содержание UltraOil 65
Страница 43: ...43 4 213 787 01...