39
6.4.2 Boiler assembly
-
Where installed, reattach the neutralisation box and the
siphon bottom part and fill with water.
-
Replace the cleaning cover
-
Replace the combustion chamber insert
-
Shut the boiler doors, tighten the locknuts equally
!
WARNING
Fold up the service staging and secure it with
the studs.
-
Replace the front cover and front plug in the burner
once more
- Start up the boiler again
-
Carry out a burner metering and if necessary adjust the
settings. Make out a measuring record.
6.4.3 Cleaning the boiler room
The boiler room is to be kept clean and free of dust!
Instruct the customer(s) on keeping the boiler
room clean.
4 213 787 / 01
MAInTEnAnCE
Содержание UltraOil 65
Страница 43: ...43 4 213 787 01...