33
5.2
Filling the heating circuit
Filling of the heating system must be carried out by equip
-
ment specialists. The filling water and supplementary
water must comply with the quality requirements in the
relevant state or country (see chapter 5.1).
5.3
Filling the water heater (if fitted)
The heating boiler may also be put into service even
when the water heater is not filled.
5.4
Commissioning
WARNING
The heat generator must be de-energised for
maintenance. Set the blocking switch to “0”
and disconnect the heat generator from the
mains (main switch, fuse).
WARNING
All electric power supply circuits must be
switched off before accessing the terminals.
•
Before commissioning, the siphon or the
neu tralisation unit must be filled with water.
•
On first putting into service, the proper func
-
tion of all safety and regulator equipment is
to be checked.
•
Operation and maintenance of the plant
must be explained in detail to the operator.
5.5
Oil burner
Setting the burner must also be carried out by the install
-
ing engineer and must correspond to the heat require
-
ment of the plant.
For this purpose, please use the technical information /
installation instructions supplied with the burner.
•
Burners are fitted with oil preheating and
when restarted are ready for operation again
after about 2 minutes’ delay.
5.6
Handover to the operator / storage
Have the operator confirm in writing that the methods of
operating and service procedures have been explained
and that he has received a copy of the relevant operating
instructions.
The handover report is on the last page of the document.
The machinery manufacturer is responsible for providing
operating instructions for the whole plant: the technical
information /installation instructions must be kept with the
plant all the time.
4 213 787 / 01
COMMISSIOnInG