4.4.4 Fitting the condensate delivery pump
1.
Install the condensate delivery pump (14, Fig. 17) as
shown in the drawing.
14
Fig. 17
8.
The hose of the siphon (11, Fig. 14) can be easily
pushed onto the drain connection of the condensate
drip tray by lifting the neutralisation box (10a, Fig. 12).
11
Fig. 14
9. Slightly loosen the jubilee clip (10, Fig. 15) and push
it upwards. Firmly tighten the jubilee clip (connection
must be sealed).
10
Fig. 15
10. Fill the neutralisation box with water.
11.
Fit the front cover (13, Fig. 16) of the neutralisation
box.
12. Fit base plate (2, Fig. 16) and front cover (1a, Fig. 11).
2
13
Fig. 16
!
CAUTION
Before commissioning the neutralisation box
must be filled with water in order to prevent
flue gas leakage.
The condensate drain must be made of corro-
sion-resistant material.
23
4 217 213 / 01
INSTALLATION
Содержание UltraGas 15
Страница 48: ...48 4 217 213 01...
Страница 49: ...49 4 217 213 01...