4.4.2 Fitting the condensate drain
(standard design with siphon)
1. Remove front cover (1a, Fig. 09). Release lateral
locking bolt (1, Fig. 09) (approx. ¼ turn to the left). Lift
the front cover straight upwards and remove towards
the front.
2. Remove base plate (2, Fig. 09). Lift base plate straight
upwards and remove.
3. Screw siphon (3, Fig. 09) on the condensate tray (4,
Fig. 09) and tighten securely (connection must be
sealed)!
4.
NOTICE
Slide the siphon support (3a) under the
siphon.
5.
Fit drain (5, Fig. 09) on siphon (3, Fig. 09) and lead
it outwards (optionally left or right side) through the
6. Fit connecting line (5, Fig. 09) to the drain line (2m
hose enclosed with the boiler).
7. Reattach front cover (1a, Fig. 09) and base plate (2,
NOTICE
The condensate drain must be made of cor-
rosion-resistant material.
!
CAUTION
Before commissioning, the siphon must be
filled with water in order to prevent flue gas
leakage.
If a neutralisation box is to be fitted, you will
find the further installation steps on the next
page.
1
1a
2
3
5
5a
4
3a
Fig. 09
21
4 217 213 / 01
INSTALLATION
Содержание UltraGas 15
Страница 48: ...48 4 217 213 01...
Страница 49: ...49 4 217 213 01...