4.4.3 Fitting the neutralisation box
(if fitted)
1. Remove the neutralisation box from its packaging.
Remove the front and rear cover of the neutralisation
box.
2. Empty the neutralisation granulate (Neutroxid) into
the neutralisation box and distribute evenly.
Neutralisation granulate
(Neutroxide)
front
6
Fig. 10
3.
Remove front cover (1a, Fig. 11). Release lateral
locking bolt (1, Fig. 11) (approx. ¼ turn to the left).
Lift the front cover straight upwards and remove it to-
wards the front.
4.
Remove base plate (2, Fig. 11). Lift the base plate
straight upwards and remove it.
1
1a
2
Fig. 11
5. Fit rear cover (9, Fig. 12) of the neutralisation box.
6. Fit jubilee clip (10, Fig. 12) approx. 20mm from the
upper end of the hose and tighten slightly. The hose
(10a, Fig. 12) of the connection eccentric (10b, Fig.
12) must be aligned towards the left.
10
9
10a
10b
Fig. 12
7.
Slide the neutralisation box (11, Fig. 13) into the boiler
until the hose of the siphon (6, Fig. 10) is directly be-
neath the drain connection.
11
Fig. 13
22
4 217 213 / 01
INSTALLATION
Содержание UltraGas 15
Страница 48: ...48 4 217 213 01...
Страница 49: ...49 4 217 213 01...