page 01
©
Suncast Corporation
Step 3: Locate the two 94” floor
band boards.
Step 1: Place package in close
proximity to assembly site.
Step 4: Align 94” band boards and mark location of floor joists using floor diagram on page 5.
Step 5:Partially start two 3” screws per joist in band boards as shown.
Floor Assembly
Step 2: Remove and organize
contents from box 1.
Step 6: Inspect each floor joist
making sure to keep any bows
turned up.
Step 7: Lay out band boards and
floor joists on a
firm, level
surface
to match the diagram on page 5.