page 03
©
Suncast Corporation
Step 11: Align corner of floor
sheet and attach using one 2”
nail.
Step 13: Attach floor sheet
perimeter to band board using 2”
nails spaced 8” apart.
Step 14: Align the outside edges of the plywood with the edge of the outside floor joist and attach with 2”
nails spaced 8” apart.
Step 17: It is important for the floor to be level. You may need to block up certain areas of the floor in
order to make it level.
Step 15: Attach sheeting to floor joists making sure joist spacing
matches floor diagram. Space nails 8” apart.
Step 16: Attach remaining floor
sheet repeating steps 10-14
keeping all edges and corners
flush.
Step 12: Align adjacent corner of
sheeting flush and attach using
one 2” nail.