![HomePlace Cedar Garden Building Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/homeplace/cedar-garden-building/cedar-garden-building_assembly-manual_2153926014.webp)
Step 36: Lift and set wall into place as shown.
Step 40: Attach siding to floor using 2-1/4” nails spaced 8” apart.
Step 42: Back wall is complete. Organize remaining parts from box 2.
page 09
©
Suncast Corporation
Step 37: Get one 3-1/4” nail
ready to pound into floor.
Step 38: Align edge of wall flush
with edge of floor and pull back of
siding tight against floor.
Step 39: Pound nail through bot-
tom plate to secure wall to floor.
Step 41: Secure bottom plate to
floor using 3-1/4” nails spaced
every 8-12”.