page 15
©
Suncast Corporation
Step 62: Remove the temporary screws holding wall and lift wall in place.
Step 63: Align right side of wall flush with edge of floor and attach to
floor through siding and bottom plate as shown.
Step 64: Make sure door opening measures equally at top and bot-
tom of door frame.
Step 65: Repeat step 63 on oppo-
site side of wall.
Front wall is complete.