7
1
1
5
3
4
2
5
5
2
2
3
3
A
B
C
Bend hanging brackets (1) so they are flat against ceiling.
Measure distance from header bracket to ceiling mounting bracket bolts.
Mark length on ceiling starting at the header wall, along this point is where the unit will be mounted.
Lift door to full open position, rest opener on door.
Insert square head screws (A) into rail assembly (B) approximately 120mm from end of rail near motor unit.
Slide hanging brackets on to square head screws and secure brackets with nuts (5).
In this process the square head screws hook into slots on the sides of rail by turning 90° (C).
For concrete ceilings, drill 8mm pilot holes into ceiling and insert concrete anchors (2).
Secure hanging brackets to ceiling with lag screws (3).
For wood ceilings, drill 4mm pilot holes and secure with lag screws (3).
Optional:
A second set of hanging brackets is recommended when door is very heavy. The hanging brackets should
be located ih the first third to the centre of the rail upwards the most during the travel.
B
1
4
A
1
2
4
15
HANG OPENER
1
2
A. 0-100mm
B. 150-250mm
A
B
1
4
C
1
2
3
3
1
2
4
1
2
14
FASTEN DOOR BRACKET
Sectional and One-Piece Door Installation
Procedure:
Door bracket (1) has left and right side fastening holes.
If your installation requires top and bottom fastening
holes use both the door bracket and door bracket plate
(2) as shown.
1. Centre door bracket (with or without door bracket
plate, as required) at the top inside face of door as
shown. Mark holes.
A. One-piece doors
Locate bracket at inside face of the door 0-100mm
down.
B. Sectional door
150 - 250mm below the top of the door.
2. Fasten bracket to the door using the appropriate
screws.
A. Wooden doors
Drill 8mm holes (5/16") and fasten the door bracket
with nut, lock washer, and carriage bolt (3)
.
B. Sheet metal doors
Fasten with wood screws (4).
C. One-piece door option
Fasten with wood screws (4).
Содержание HE60ANZ
Страница 2: ......
Страница 20: ...114A3370D 18 2010 The Chamberlain Group Inc ...