ELECTRICAL SYSTEMS - HOUSE — 8
180
2008 IMPERIAL
Inverter three-stage charging cycle:
Bulk Charge Cycle:
Brings the DC voltage
up high, initially between
14.2 - 14.6 Volts DC.
The length of time
the inverter is in Bulk
Charge depends the state
of charge of the batteries.
Absorb Cycle:
Absorb
Cycle battery voltage
is the same as the Bulk
Charge Cycle, between
14.2 - 14.6 Volts DC.
Length of the Absorb
Cycle is a timed event
determined by the
inverter.
Float Charge Cycle:
Charge voltage is
generally around
13.3 - 13.7 Volts DC.
Approximately 80% of
the charging cycle has
been completed by this
time.
NOTE:
Refer to the OEM manual located in
the Owner’s Information File Box for
detailed instructions.
Auto Generator Start
The
Auto Gen Start (AGS)
allows the
inverter remote control to start the generator
when battery voltage or interior motorhome
temperature reaches a preset point.
NOTE:
Generator run time, battery voltage and
interior temperature settings for the
AGS function must be set at the AGS
controller prior to enabling AGS. The
controller is located in a cargo bay next
to the inverter. Refer to the OEM manual
located in the Owner’s Information File
Box for detailed instructions.
To Enable AGS:
Press the AGS button on the inverter
remote panel. Use the select knob to
scroll through the AGS menu options
until “
AutoGenSt Enabl
” appears. Press
the select knob to activate the AGS.
To Disable AGS:
Press the AGS button on the inverter
remote panel. Use the select knob to
scroll through the AGS menu options
until “
AutoGenSt OFF
” appears. Press
the select knob to deactivate the AGS.
AGS Controller:
Located next to inverter in large
pass-through bay.
060299
Hose = Inverter in Charge Mode
Bucket = Battery
060236c
Bulk Charge
Water (charger) on full until bucket
(battery) is 80% full.
Absorb Charge
Water (charger) slows until bucket
(battery) is 90% full.
Float Charge
Water (charger) slowly trickles into bucket
(battery) until 100% full. Water (charger)
will adjust
fl
ow to maintain level.
Содержание Rambler Imperial 2008
Страница 16: ......
Страница 18: ......
Страница 51: ...47 2008 IMPERIAL DRIVING SAFETY 2 Weighing Procedure Worksheet Weight Record Sheet 020255c...
Страница 120: ...APPLIANCES 4 116 2008 IMPERIAL NOTES...
Страница 163: ...159 2008 IMPERIAL WATER SYSTEMS 6 AQUA HOT BAY Optional 040602c Cover Attached 040602e Cover Removed...
Страница 194: ...ELECTRICAL SYSTEMS HOUSE 8 190 2008 IMPERIAL ELECTRICAL LAYOUT TYPICAL 060191u...