Page 12
Model
Flue Size (Sq. Inch)
Minimum (Sq. inch)
Maximum (Sq. Inch) Int/Ext
Stoker
6”
28 sq. in.
6”
28 sq. in.
84 sq. in.
interior
Furnace
6”
28 sq. in.
6”
28 sq. in.
56 sq. in.
exterior
Chimney Height Requirements:
The minimum height of a chimney system for the Hitzer Stove is 15
feet. The chimney must exceed the roof of a house a minimum of 3 feet at any point of exit. In pitched
roof installation the chimney must be at least 2 feet higher than anything within a 10 foot radius of the
chimney. It is important to have a chimney draft of .03 - .06 wc. Never operate your furnace at a flue draft
exceeding .06 wc (14.945 Pa) or less than .03wc (7.473 Pa)
. It is required to abide by the manufacture’s
instructions on class A chimney’s as well as local building codes.
All of these requirements must be followed to ensure the best chances for good draft. There are however
many environmental factors that can effect your draft. A few of these include wind speed and direction,
obstructions diverting winds, barometric pressure and humidity. This is why it is essential to have a
barometric damper and carbon monoxide detectors/alarms installed and working properly.
Power Vent System:
A Hitzer approved power vent may be used in place of a chimney. BE SURE TO READ YOUR POWER
VENTER INSTALLATION AND OPERATION INSTRUCTION MANUAL BEFORE USING THE POWER
VENTER. Follow the instructions that come with the power venter, for cutting the hole, and mounting the
venter to the wall. Connect your Hitzer Energy Master II Stoker Furnace to the power vent using a 6 inch
stove pipe and a barometric damper. You need to make certain that the pipe joints are tight together and
screwed with a minimum of three sheet metal screws per joint.
Once you have the vent system
installed you can then install the wall control thermostat system according to the COAL-TROL
DIGITAL™ instruction manual which is supplied in the thermostat box.
Note:
-Illustrations are not drawn to
scale
-For design purposes only
-Actual Installations may vary
Содержание Energy Master II 710
Страница 7: ...Page 7 ...
Страница 16: ...Page 16 VI Troubleshooting ...