This installation should comply with requirements of CAN/CSA-B365, and changes are made 
to the central furnace, changes must comply with CSA B139 (for oil-fired), C22.1 (for electric), 
or CAN/CGA-B149.1 or CAN/CGA-B149.2 (for gas-fired). 

 

This add-on furnace must only be installed on a furnace duct system and chimney that are in 
good operating condition. 

 

IV. Flue Systems 

 

 
Masonry Flue System: 

A good chimney is essential.  A masonry chimney

 

must be built with a low heat 

masonry material.  It is important to make sure that the masonry chimney is structurally sound and on a 
solid foundation. The masonry chimney must have a liner installed within the chimney construction.  An 
unlined chimney is not safe with solid fuel systems, and may result in a house fire. The liner may be a 
structurally

 

sound clay liner or a stainless steel liner.  If using an existing masonry chimney, be sure to 

have the chimney examined and cleaned by a chimney professional.  The structural foundation of the 
chimney and liner are important.  If the existing clay liner is cracked or damaged, it is recommended to re-
line the chimney with a stainless steel liner or other chimney relining system.  Be sure the masonry 
chimney is compatible with the local building codes and requirements. It is important to note that you can 
only have one appliance per chimney, and it is not permissible to connect your Hitzer Energy Master II 
furnace to a chimney that is servicing another appliance. 
 

Factory Built System:  

A good chimney is essential. The factory built chimney must be a Class A: High Temperature chimney UL 
listed to UL 103 (CAN/ULC-S629-M87) Type HT.  It is required for this Class A chimney to be listed and 
labeled under the UL standards.  If using an existing factory built Class A chimney it must be inspected 
and cleaned by a certified chimney professional, before use. With Factory Built Chimneys, clearances 
and distance requirements are required per chimney style.  Be sure to follow the manufacturer’s 
clearances and regulations. It is also important to abide by the rules and regulations of local jurisdictions 
upon chimney installation. Like masonry chimneys, you can only have one appliance per chimney, and it 
is not permissible to connect your Hitzer Energy Master II furnace to a chimney that is servicing another 
appliance. 
 

Flue Requirements: 

It is required to have a chimney that is built according to the chimney 

manufacturer’s specifications and meets local building codes. It is also required to have your chimney 
inspected and cleaned by a certified chimney professional before your Hitzer Energy Master II furnace 
installation, and periodically during the heating season. When wood is burned slowly, it produces tar and 
other organic vapors, which combine with expelled moisture to form creosote. The creosote vapors 
condense in the relatively cool chimney of a slow-burning fire. As a result, creosote residue accumulates 
on the flue lining. When ignited, this creosote makes an extremely hot fire, the results of which can be 
tragic. If material has accumulated, it should be removed immediately to reduce the risk of a chimney fire. 
An Anthracite coal fire, as a general rule, does not produce creosote so it should not add to a creosote 
buildup. It can however get hot enough to ignite an existing buildup thus causing a chimney fire.  

IF A CHIMNEY FIRE DOES OCCUR:

 Notify all the occupants of the house and call the fire department 

immediately. Turn the power to the furnace turned off, and any draft controls should be closed. The 
barometric damper should be blocked then exit the house at once! 
  

Flue Size:  

The proper flue size is very important.  The proper flue size is essential in order to have the 

correct amount of draft required to operate the Hitzer Furnace.  The

 

diameter of the flue size including 

chimney liner should never be less than the diameter of the flue exhaust collar on the Hitzer Furnace. The 
flue size for the Stoker Furnace should be a minimum of 6 inches in diameter 
 
    The flue size also has a maximum size of inches in order to sustain the desired draft.  For an interior 
chimney the flue and chimney liner size 

cannot 

be larger than 

3 times

 the square inches of the flue 

exhaust collar on the Hitzer stove. For an exterior chimney that has at least one side exposed to the 
exterior of the house the flue and chimney liner 

cannot

 be more than 

2 times

 the square inches of the 

flue exhaust collar of the Hitzer Furnace.  Also keep in mind the warmer the chimney is the better the 
draft. 
 

Содержание Energy Master II 710

Страница 1: ...SONAL INJURY OR EVEN DEATH REFER TO MARKINGS ON THE FURNACE FOR ADDITIONAL INFORMATION CARBON MONOXIDE AND SMOKE DETECTORS ALARMS MUST BE INSTALLED IN THE HOME AND WORKING PROPERLY DANGER RISK OF FIRE OR EXPLOSION DO NOT BURN GARBAGE GASOLINE DRAIN OIL OR OTHER FLAMMABLE LIQUIDS DO NOT USE CHEMICALS OR FLUIDS TO START FIRE BURN RICE SIZE ANTHRACITE COAL ONLY STOVE SURFACES MAY BE HOT WHILE IN OPER...

Страница 2: ...eturn Air D Combustion Air E Installation In A Confined Space IV Flue Systems A Masonry System B Factory Built Systems C Chimney Requirements D Flue Size E Chimney Height Requirements F Power Vent System V Basic Regulations for Safe Operations A Cautions B Local Codes VI Stove Start Up Operation A Install Coal Trol Thermostat B Start Up C Adjusting Chimney Draft D Measuring Furnace Compatibility V...

Страница 3: ...fire follow the installation instructions carefully Failure to follow these instructions may result in property damage bodily injury or even death Contact your local building inspector or fire officials about the need for a permit restrictions or installation inspection required in your area Refer to makings on your furnace for more information Save these instructions for future reference Safety N...

Страница 4: ... Once it is determined your existing furnace will accept an add on installation a parallel installation with return air outlined later in this manual is recommended 3 Can the furnace be vented properly a Is the chimney appropriate for this installation This furnace requires installation in a masonry chimney with a clay flue liner or a metal all fuel chimney listed to UL103 CAN ULC S629 M87 Type HT...

Страница 5: ...ated and make placement of the Energy Master Furnace to achieve maximum heat benefit it can produce Clearances To Combustibles Floor Protection This furnace must be placed on a non combustible floor If the floor is a combustible material floor protection must be placed underneath it and extend at least 8 inches on each side of the fuel or ash door It must also extend 16 inches out from the front o...

Страница 6: ...ter Furnace to the chimney should be made as direct as possible It is not recommended to use more then 2 elbows for venting The pipe connecting the furnace to the chimney should be at least 24 gauge single wall pipe Thicker gauges and double wall pipe may be used A inch slope back toward the furnace per foot of horizontal run is required This allows any condensation forming in the pipe to flow bac...

Страница 7: ...Page 7 ...

Страница 8: ...are drawn with a masonry chimney Manufactured metal chimney listed to UL 103 CAN ULC S629 M87 Type HT or a Hitzer approved power vent system may also be used Follow manufacturer s instructions guidelines when using these products ...

Страница 9: ...our basement unnecessarily heating unused portions of your home The return duct should be a minimum of 16 x 20 or equivalent 320sq in The return duct may be attached to the rear of the stoker furnace Make sure if you are attaching the duct to the rear of the furnace you do not inhibit the removal and replacement of the furnace filters These filters should be checked and cleaned replaced regularly ...

Страница 10: ... Supplemental add on Furnace Installations Do not use duct elbows having an inside radius of less than 6in 150mm on the oil gas electric furnace Do not connect to a down flow furnace Do not connect ductwork so that a reverse flow is possible Operate the gas oil electric furnace periodically to ensure it will operate satisfactorily when needed Certified for installation with the ductwork configurat...

Страница 11: ... only have one appliance per chimney and it is not permissible to connect your Hitzer Energy Master II furnace to a chimney that is servicing another appliance Flue Requirements It is required to have a chimney that is built according to the chimney manufacturer s specifications and meets local building codes It is also required to have your chimney inspected and cleaned by a certified chimney pro...

Страница 12: ...our draft A few of these include wind speed and direction obstructions diverting winds barometric pressure and humidity This is why it is essential to have a barometric damper and carbon monoxide detectors alarms installed and working properly Power Vent System A Hitzer approved power vent may be used in place of a chimney BE SURE TO READ YOUR POWER VENTER INSTALLATION AND OPERATION INSTRUCTION MA...

Страница 13: ...he properly constructed and in good top of the fire box When the door is condition Chimney must be at least 15 opened oxygen combines with gases high and exceed the roof a minimum of and ignites 3 feet unless using Power Vent System WARNING Risk of Fire WARNING Over Fire Unit Comply with all minimum clearances to Do NOT over fire your unit combustibles as specified This will cause warping of fire ...

Страница 14: ... hole to read the chimney draft Adjust the barometric damper so that your manometer reads between 03 and 06 inches of water column following the instructions provided with the damper Do not run at a draft above 06 inches of water column as this could cause your stoker to over fire Over firing can cause a dangerous fire hazard It would be best to set it with a manometer if available The settings on...

Страница 15: ...amount of coal burned ash content of the coal the burn rate and draft of the chimney Allow stoker to run out of coal go out and cool down Remove chimney connector pipes and check and remove any fly ash accumulation This will mainly be at the bottom of elbows and horizontal runs Remove all fly ash from heat exchanger plates inside and below the flue collar and on the floor of the stoker around the ...

Страница 16: ...Page 16 VI Troubleshooting ...

Страница 17: ...rmined by the capacity and condition of the battery and the amount of heat needed Some generators will also work however the output of either must be a pure sine wave Other outputs can cause the Coal Troll Digital to not work You may also contact your Hitzer dealer or Hitzer Inc for questions or more information regarding stove installation and operation Hitzer Inc 269 E Main St Berne IN 46711 260...

Отзывы: