7-53
MAINTENANCE
Table 2. Lines
Interval (hours)
Check Points
Abnormalities
Remedies
Daily
Contact surfaces of
flange joints
Leak (11)
Replace
O-ring and/or
retighten bolts
Welded surfaces on
joints
Leak (12)
Replace
Every 250 hours Joint neck
Crack (13)
Replace
Welded surfaces on
joints
Crack (12)
Replace
Clamps
Missing
Replace
Deformation
Replace
Loose
Retighten
f
NOTE: Refer to the illustrations in Fig. 2 for each check point location or for a description of
the abnormality. Use genuine Hitachi parts.
M4GB-07-059
M4GB-07-060
12
13
12
Fig. 2
13
11
Содержание ZW 370-6
Страница 4: ...MEMO ...
Страница 10: ...CONTENTS MEMO ...
Страница 12: ...2 MACHINE NUMBERS Aftertreatment Device SCR TYPE MFG NO DOC TYPE MFG NO 95Z7B SCR4 95Z7B SCR4 ...
Страница 53: ...SAFETY LABELS S 41 95Z7B S 40 ...
Страница 148: ...1 84 OPERATOR S STATION MEMO ...
Страница 218: ...OPERATOR S STATION 1 154 MEMO ...
Страница 220: ...2 2 BREAK IN MEMO ...
Страница 236: ...3 16 OPERATING THE ENGINE MEMO ...
Страница 284: ...OPERATING THE MACHINE 5 28 MEMO ...
Страница 426: ...MAINTENANCE 7 132 MEMO ...
Страница 430: ...9 4 MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS MEMO ...
Страница 434: ...10 4 STORAGE MEMO ...
Страница 440: ...11 6 TROUBLESHOOTING MEMO ...
Страница 442: ...12 2 SPECIFICATIONS MEMO ...
Страница 450: ...14 8 INDEX MEMO ...